High Point collective sale tender to close on July 28


The guide pricing of $550 million for the area calculates to $2,508 psf per plot ratio after considering the 7% perk GFA for terraces. The project expense payable for the 7% benefit GFA refers to $18.8 million.

Avenir Condo floor plan

Savills says the location can be redeveloped into a 36-storey ultra-luxurious high rise of 98 units, presuming an ordinary size of 2,153 sq ft per unit. Builders might likewise pick to build even bigger units to deal with fresh need from ultra-high-net-worth foreign buyers. Pointing out deluxe apartment Park Nova as an example, Savills mentions that 37 out of the 54 units available at Park Nova have actually been marketed because its release last June at an ordinary price of $4,815 psf.

Lake now claims that the July 28 closing date has been prepared complying with rate of interest registered by developers. “After releasing the general public tender in March we have been in continuous contact with programmers and also the interest degree in super prime residential sites has gotten,” he includes. He adds that international developers have likewise been able to check out Singapore given that travel limitations have been reduced.

Lake thinks that supply of all-new ultra-luxurious apartments will continue to be “highly constricted”, given that the current air conditioning steps might make it more difficult to obtain the 80% consensus needed to proceed with a cumulative transaction, particularly for developments in the core central region (CCR) where foreign property is much higher. This is due to the fact that international owners are going to need to pay a higher ABSD (Additional Buyer’s Stamp Duty) when they purchase a replacement residence “as well as consequently may be less eager to participate the cumulative sale,” he incorporates.

No closing schedule was set at the moment of the release tender in March. Jeremy Lake, Savills’ operating executive for financial investment sales as well as resources markets, was then estimated as saying that a closing date would certainly be selected when confirmed interest had been obtained from a minimum of one developer.

The public tender for High Point, a 59-unit condominium block at 30 Mount Elizabeth, will close on July 28, according to sales broker Savills. The residence was relaunched for collective sale on March 21 with an overview price of $550 million, following a previous pursuit final year that saw Hong Kong-listed Shun Tak Holdings terminate its purchase of the property.

The 22-storey High Point was finalized in 1973 and sits on a 47,606 sq ft household site. It has an existing complete gross floor location (GFA) of around 211,976 sq ft, or a plot ratio of 4.45. Under the URA Master Plan 2019, the site has a permitted gross plot ratio of 2.8 and also level control of up to 36 floors. The URA development baseline is approximately 213,383 sq ft with a plot ratio of 4.48. A pre-application workability research study is likewise not needed by LTA for the area redevelopment for up to 196 units.


error: Content is protected !!